Running a small workshop, unit, or industrial space often means working with powerful equipment — from machinery and compressors to specialised tools. But many small premises weren’t originally designed for heavy electrical loads. Without the right wiring and supply, you risk tripped circuits, overheating cables, or even dangerous faults.
This guide explains how to safely power heavy equipment in smaller industrial settings, avoid common pitfalls, and set up your workspace for reliable, efficient operation.
Why Electrical Planning Matters for Heavy Equipment
- Safety first: Overloaded circuits can overheat and cause fire risks.
- Productivity: Reliable power means fewer interruptions and downtime.
- Compliance: Meeting regulations keeps staff safe and insurers satisfied.
- Future growth: Designing for extra capacity saves hassle later.
Key Considerations
- Assessing Power Demand
Every machine has a rated load — adding up all your equipment helps determine whether your existing supply is sufficient. - Single-Phase vs Three-Phase
Some machinery requires three-phase power. Even if you only have single-phase now, it may be worth upgrading if your work is expanding. - Dedicated Circuits
Heavy equipment should not share circuits with general sockets or lighting. Dedicated circuits prevent tripping and reduce wear on the system. - Correct Cabling & Protection
Cables must be sized to handle the load. Protective devices (like circuit breakers) should match the equipment’s requirements. - Ventilation & Heat Management
Power-hungry machines generate heat — both in themselves and the electrical system. Proper installation reduces risks and improves efficiency. - Emergency Power-Off & Safety Features
Industrial settings should have clear shut-off points and emergency stops, ensuring safety in case of malfunction.
Common Pitfalls to Avoid
- Relying on extension leads — unsafe for heavy loads.
- Underestimating startup currents — motors often draw much more power on startup than in operation.
- Overloading circuits — even if it “just about works,” long-term damage or failure is likely.
- Skipping certification — insurance and compliance depend on correct installation and sign-off.
Frequently Asked Questions
-
Do I need three-phase for heavy equipment?
Not always. Some heavy machines can run on single-phase, but many perform better (or only work) on three-phase.
-
Can I add just one new circuit for my biggest machine?
Yes, but it depends on your supply capacity. Often a review of the whole setup is more cost-effective than piecemeal changes.
-
Will installation disrupt my work?
IWe plan installations around your schedule to minimise downtime, often completing major works out of hours.
Checklist: Powering Heavy Equipment
- Calculate total equipment load
- Check supply capacity (single or three-phase)
- Install dedicated circuits
- Size cabling correctly
- Include safety shut-offs
- Arrange professional testing and certification
Conclusion & Next Steps
In small industrial settings, electrical planning is the difference between smooth operations and constant frustrations. With the right setup, your equipment will run safely, efficiently, and without interruption.